Anti-Static Flooring
High Quality H Shaped Steel Beam Standard for Steel Structure Factory Building Construction, Having
2017-11-25 05:49  Visit:198
Price:Unfilled
Send inquiry



Key advantage:

 

1)Top client: SIEMENS, American GE, FRANCE ALSTOM, French energy power, Vale of Brazil etc.

2)90% exported to 40 countries like Germany, America, Slovakia,Saudi Arabia, South Africa, Oman etc.Total weight 400,000tons.

3)Certificate:

ISO9000, ISO14000, ISO18000 by BV France        

EN-1090 CE certificate

American CWI

European TWI

European IWE

 

1.Our service

Our service also extends to ensure structural requirements are complied with and, once the initial proposal details are approved, we then provide construction issue drawings together with maintenance details for inclusion within your records.

 

2.Our production layout and material handling facilities are continuously developed to ensure we maintain the most efficient set up possible, investment in stock yard gantry cranes and multiple state of the art steel handling vehicles continues to minimise time taken in non-value added activities.

We can provide all industry standard finishes including paint systems, powder coating, zinc spray and galvanising.

 

3.PRE-ENGINEERED BUILDINGS IS MADE UP OF

Primary members (columns and rafters)

Secondary members (purlins, girts and eave struts) which are cold-formed “Z” and “C” shaped members or open web joists

Roof and wall sheeting connected to each other

 

4.We takes pride in being an honest, transparent and responsible participant and is committed to promoting best practice throughout the industry. The company has an exemplary record in health and safety, environmental responsibility and quality management, and is ISO 9001; ISO 14001 & OHSAS 18001 registered.

In addition to being a dynamic and progressive organisation, we retains the caring values that have always been at the heart of this family-owned business.

  

5.We continually train and update our site teams in line with industry best practice while recognising the advantages of using the most advanced equipment available.

Haulage of steelwork to site is managed by our in-house transport and logistics business who operate a wide-ranging steel delivery vehicles throughout the conuntry.

How long is delivery

RE: Generally, the delivery time of sandwich panel is within 7 days; and 30 days for prefabricated house. The exact delivery time should depend on the quantity and confirm with factories.

 

6.Project name:Fabricated Structural Steel Factory

Total area:4813.24m2

Project time:the year of 2007

Project location:Angola,Africa

 

7.We have been involved in“h beam structure”supply for many years.

It has different names like below:

h shaped steel beam

h beam standard

beam h

we have very good reputation in this field all over the world.



Message

TO: sdhxgg

E-mail:

Content:

Contact information
Comment
0